Our Powered Stairclimbing Work 

Take a look below at the type of powered stairclimbing work we've carried out in the past.

Construction Site Heavy Powered Stairclimbing Service

Olympic Park Orbit Tower Glass Panel Stairclimbing 

Scope: Lift a 250kg glass panel from ground floor to roof of the Orbit Tower
Environment: Active Construction Site
Location: Olympic Park, London

Key constraints:

  • Stairclimbing Battery Management
  • 250kg x 2900 x 1250 x 30 Fragile Glass Window
  • Many Contractors and active plant on site

Method summary:

  • Stairclimb from ground floor to 114 m top floor
  • Very long single staircase from top to bottom
  • Using a Powermate LE-1 and custom foot attachment
Orbit Tower London
Heavy Powered Stairclimbing Service & Transport

Morrisons Store, Middlesbrough

Scope: Lifting 2 x 520kg switch gear panels from ground to 3rd floor
Environment: Active Construction Site
Location: Morrisons Store, TS14

Key constraints:

  • Heavy Stairclimbing in enclosed staircase 
  • Fragile switch gear with many electrical components exposed
  • Many Contractors in busy active site

Method summary:

  • Use a Powermate M1-B to take advantage of the additional height
  • Small concrete construction site staircase
  • Tight 180° corners required specialist landing aparatus
Powered stairclimbing heavy switch gear for an M+E company
Heavy Powered Stairclimbing Service

Grand Pacific Manchester

Scope: Lifting a replica 350kg Replica Statue of Gladstone from 1st floor location to ground 
Environment: Active Hospitality Site
Location: 81 King street Manchester

Key constraints:

  • Very large statue
  • Uneven shape and weight
  • Out of hours due to active hospitality location

Method summary:

  • Use a Powermate M1-B to for stability and height
  • Finished carpeted stairs required careful operation
  • Powered stair climbing from 1st floor down 180° stairs to ground floor
Powered stairclimbing a heavy statue downstairs
Powered Stairclimbing Service Into Basement

Lee Park - Logistics & Technical Services

Scope: Stairclimbing a water Pump from ground floor to  location to 8th floor underground plant room
Environment: Active Logistics storage facility
Location: Corsham SN13

Key constraints:

  • Deep underground facility with oxygen safety considerations 
  • Active plant and vehicles
  • Rescue plans and underground safety 

Method summary:

  • Use of  a Powermate Le-1 to for speed and counter-balance
  • Single flight of stairs down 8 floor levels
  • Powered stair climbing from ground floor and into plant room location requiring accurate positioning
Powered stairclimbing a heavy pump into an underground plant room
Powered Stairclimbing Potted Trees

Farmington Lodge Planter Stairclimbing

Scope: Stairclimbing 8 x potted trees in planters for the Princess of Greece in Farmington
Environment: High End Residential Property
Location: Farmington, North Leach

Key constraints:

  • High end finishes required protection
  • Variable load weight distribution
  • Quick turn around time frame

Method summary:

  • Use of  a Powermate Le-1 for speed and weight distribution management.
  • All 8 x planted trees required stairclimbing around various points of owners swimming pool area.
  • All 8 trees had a different load balance and required center of gravity assessment
Powered stairclimbing heavy planter in Gloucestershire
Powered Stairclimbing Plant Room Equipment

38-42 Moseley Street, Manchester

Scope: Lifting condensers, boilers and buffer vessels from ground floor to rooftop plant room
Environment: Commercial Property
Location: Manchester,  M2 3AZ

Key constraints:

  • Crane couldn't be used due to time constraint 
  • Small internal staircase lifting
  • Short Notice Lifting Requirement

Method summary:

  • Use of  a Powermate Le-1 for speed and weight distribution management.
  • All the different plant room equipment had to be taken and placed precisely for connections
  • Fragile but heavy components
Powered stairclimbing plant room equipment in manchester
Stairclimbing Datacenter Air Conditioning Units

Arrow Electronics / Raytheon UK

Scope: Lifting Denco Air conditioning unit to upstairs server room
Environment: Business & Manufacturing Center
Location: Harlow,  CM17

Key constraints:

  • Space constraints due to the size of the units 
  • Top heavy unit due to compressor placement
  • Out of hours working

Method summary:

  • Use of a Powermate M2-B due to size and weight
  • Tight 180° landings required careful management
  • Precise final positioning over air vents 
Powered stairclimbing air conditioning unit in a data center

We Regularly Lift And Shift Throughout the UK

Vending machines Catering equipment - Safes - Boilers - Air conditioning plant - Glass - Machinery - Laboratory equipment - Medical equipment - Server racks - Plant room equipment - AHUs - Transformers - Generators - Steelwork and beams - and more.